Introducing the ADCC Pipeline - A Breakthrough Collaboration by Whistler Pipeline, LLC and Cheniere Energy, Inc.
This pipeline, stretching across approximately 43 miles with a diameter of 42 inches, has been strategically designed to accommodate a capacity of 1.7 billion cubic feet per day (bcfd).
It serves as a vital link in collecting natural gas from the Whistler pipeline near Aqua Dulce, ensuring a consistent and uninterrupted flow of resources. With an expected commissioning date in 2024, the ADCC Pipeline will play a crucial role in meeting the facility's orders, supporting a reliable supply of natural gas for the foreseeable future.
Utilizing our tool, we have successfully identified the sources of gas for the Whistler pipeline at Aqua Dulce. The Tennessee Gas pipeline, Natural gas pipeline, and Valley Cross pipeline are among the suppliers located near Aqua Dulce.
These strategic connections ensure a steady and reliable supply of natural gas to the Corpus Christi liquefaction facility. By leveraging these pipelines, the facility can maintain a consistent flow of resources, ultimately supporting the operations of the Corpus Christi LNG plant.

Comments